Tamilnadu Irrigated Agriculture Modernisation and Water-Bodies Restoration and Management - (TN-IAMWARM PROJECT)

ANNUAL REPORT

Annual Report 2007-08

Annual Report 2008-09

Annual Report 2009-10

Annual Report 2010-11

Annual Report 2012-13

 

Rounded Rectangle: IAMWARM  Project  Project Period - 7 years (2007- September 2014)   

Rounded Rectangle: Implemented in 61 sub-basins   out of 127 sub-basins in Tamil Nadu   to benefit 6.70 Lakh Ha.

Text Box: Component A - IrrigationSystem Modernisation  Revised Outlay Rs.1899.35 Crore

Administrative Sanctions Accorded

ENVIRONMENTAL ACTIVITIES

Rounded Rectangle: Environmental activitiesRounded Rectangle: 	Environmental activities undertaken in the project   v	 Testing of soil & water samples  v	 Preparation of Environmental Impact Assessment study, Environmental Atlas   v	 Awareness programme for public, school children  v	 Motivating office bearers of local bodies, officials  v	 Work shops @ sub-basin & regional level, demonstration for weed eradication

PRE PROJECT CONDITION

  1. Total length of anicut 280 m .
  2. Damaged length of anicut 110 m.
  3. This anicut was constructed with concrete without proper  foundation. Hence, the middle portion of anicut  for a length of 110 m was damaged.

 

scan0004scan0006scan0005

 

Rounded Rectangle:    AMBULIYAR SUB BASIN (PACKAGE –II)-ILLUPPAIKULAM TANK

 

 

scan0002

 

scan0001

 

 

 

scan0003


 
Rounded Rectangle:    KOTTAKARAIYAR SUB BASIN -SENGULAM TANK (PACKAGE NO : 03)

 

TANKDETAILS
Total Bund Length : 2100m,   
No.of.sluices : 4 nos,   
No of Weir 1no,
Total Ayacut : 64.09 Hec,    
Total Capacity : 15.17 m.cft,

   

EACB26B4,F441A968,1ABD19F4,3CC58965   

FARMERS OPINION
Thiru. Annadurai (President, Water Users Association): The Palkulam Tank is having an ayacut of  56.66 Ha with the capacity of 10.62 Mcft. But due to poor standard of tank bund and heavy leakage in the sluices and in weir water not able to store to its full capacity which leads to Gap in the Ayacut. Now after the complection of reconstruction of sluices and repair of weir the leakage in the sluices and seepage in the weir has been arrested completly. Due to this, last year this tank had been filled with water almost to F.T.L.